M42 Active traffic management
Terms of reference (20 kb)
Terms of reference for the advanced traffic management feasibility study.
- Published:
- 25 October 2007
ATM Monitoring and Evaluation (12 months) (8 Mb)
Overall the analysis of 12 months worth of data completed under the Active Traffic Management (ATM) monitoring and evaluation project has confirmed, and are consistent with, the 6 month results. 4 Lane Variable Mandatory Speed Limits (4L-VMSL) offers a significant improvement in traffic conditions on the M42-ATM section. This report supersedes the 6 month report as it provides an evaluation over a longer time period.
- Published:
- 28 July 2008
ATM Monitoring and Evaluation 4-Lane Variable Mandatory Speed Limits (11 Mb)
6 Month Report (Primary and Secondary Indicators) (203754_MM_007_V2b; DOC/1807/V2b). Please note this is a large file which takes time to download. You may find it easier to right click on the link and select Save Target As (IE).
- Published:
- 25 October 2007
For related documents, pages and internet links, see the column on the right.
